This topic describes the steps to migrate an existing high-availability (HA) Control Room cluster on Linux to new servers without losing cluster state or historical data.
About this task
Rehydration is the process of moving an existing Control Room HA cluster to new servers while the Elasticsearch data and Apache Ignite cluster state are carried over from the old cluster. The new cluster continues to use the existing Control Room database and server repository.
Before you begin
Review and complete the following before you begin. This procedure requires downtime for the cluster.
- Infrastructure
- Three new Linux virtual machines (VMs) are provisioned, networked, and reachable from the existing Control Room database server.
- Firewall rules and ports are opened as described in the Control Room installation guide.
- DNS resolution is validated between all nodes.
- System time is synchronized (NTP).
- The node mapping between existing and new servers is documented, for
example:
- Existing Node 1 → New Node 1
- Existing Node 2 → New Node 2
- Existing Node 3 → New Node 3
- Certificates
- SSL certificates are created.
- Subject Alternative Name (SAN) entries include the new server hostnames or IP addresses.
- Backup (mandatory)
Important: Do not proceed without completing all backups.
- Back up the Control Room database.
- Back up the following Elasticsearch folders:
- /opt/automationanywhere/automation360/elasticsearch
- /opt/automationanywhere/automation360/appdata/elasticsearch
- Save a screenshot of the Audit logs page.
- Capture and record Elasticsearch (ES) health from the
old cluster:
GET _cluster/healthGET _cat/nodes?vGET _cat/shards?v
- Access
Ensure that you have root or
sudoaccess to all existing and new servers, and access to the Control Room database to run SQL statements.
Procedure
What to do next
Complete the following validations:
- All Control Room services are running on all three new nodes.
- You can access the Control Room UI and log in.
- Existing automations, users, and roles are visible.
- You can run a sample automation successfully.
- Historical audit logs are available, and new audit log entries are generated after rehydration.
- The application logs contain no errors.